New Headworks at Sewage Treatment Plant, WSMR
Project Images

White Sands Missile Range

SUmmary

Samcon was the prime contractor on a design build project to renovate an existing sewage treatment facility by demolishing the existing, outdated Headworks and installing a new automated Headworks. The project was at White Sands Missile Range, NM.
 
This project was a design build which integrated the existing sewer main from WSMR into a renovated Headworks. Our design and construction included a temporary by-pass system, new concrete diversion channels, new gates, new automatic augers, grit collector, mechanical screens, splitter box and new conveyor belts sorting the debris to a new trash dumpster enclosure.
 

Checklist

  • Earthwork
  • Demolition
  • Temporary By Pass System
  • New Concrete Footings and Channels
  • T-lock Channel Liner
  • Gates and SS Grates
  • Specialized Automated Augers, Mechanical Screens, Conveyors
  • Electrical upgrades to power the new equipment